Santee Electric Cooperative Inc.
Your Touchstone Energy Partner
Miscellaneous

 

General Service

Availability

This Schedule is available for electric service to any nonresidential consumers at a single point of delivery with transformer capacity up to 125 KVA.  This Schedule is not available for seasonal or standby service or for any contract period less than 12 months.  This Schedule shall apply to loads such as small commercial, industrial, churches, schools, farms and other miscellaneous loads.

Type of Service

The Cooperative will provide service at 60 hertz, single-phase 2 or 3 wires, or three-phase 3 or 4 wires, at our standard distribution voltages.

Monthly Rate

Basic Facilities Charge $13.00

Energy Charge per kWh $0.11300 per kWh

Service Provisions

  1. The charges computed at the above monthly rate shall be subject to applicable South Carolina Sales Tax, franchise fees, assessments, and surcharges imposed by any governmental authority.
  2. The minimum monthly charge under the above rate shall be the monthly facilities charge for all customers served under this rate schedule except those customers for which a higher minimum monthly bill is required under the cooperative's standard policy because of special circumstances affecting the cooperative's cost of rendering service.
  3. The amount calculated at the above rate is subject to be adjusted monthly by the Cooperative's projected wholesale power cost.  The rate shall be adjusted by a TIER (Times Interest Earned Ratio) adjustment factor to cover wholesale power cost changes and a rate necessary to maintain TIER as set forth by the mortgage agreements between the cooperative and its approved lending agencies.
  4. A contribution-in-aid of construction may be required to provide additional capacity adequate to serve abnormal electrical load.
  5. This rate schedule includes cost for installed facilities adequate to serve a 200A service entrance rating.  If the Cooperative is required to install excess facilities without anticipated additional electric usage there will be a required contribution-in-aid to construction as calculated using the approved cooperative line extension policy.
  6. The Cooperative's facilities used to provide electrical service have definite capacity limitations and can be damaged by overloads.  Therefore, the Consumer must notify the Cooperative prior to making alterations to the service entrance equipment so that facilities of proper capacity may be provided.  The Consumer shall be responsible for all expenses and/or damages to Consumer's facilities resulting from failure to give proper notice.  The Consumer may also be subject to a contribution-in-aid of construction for work required to meet the Consumer's alterations.  The Consumer should contact the Cooperative for information concerning charges for such work.
  7. Intermittent service connections and disconnections are subject to an operating service charge of not less than $25.00.
  8. Bills are due upon receipt.  Bills are delinquent 22 days from the date of the bill and subject to a late payment charge equal to an additional two percent (2%).  Those unpaid after 30 days are subject to service disconnection.
  9. The basic monthly bill will be increased by $9.00 for three phase service.
  10. Temporary service or construction service shall be supplied at a single point of delivery and in accordance with the Cooperative's Line Extension Plan.
  11. Service under this schedule is subject to the provisions of the Cooperative's Service Rules and Regulations.

Supersedes Schedule E
Effective for bills rendered on and after November 1, 2010

Back to the Rate Restructuring section.

Printer Friendly
Email a Friend