The member/owner must negotiate a one, two or three year agreement with a Santee Electric Cooperative representative before security lighting facilities are installed. The Cooperative will install, own and maintain equipment to supply lighting service mounted on a 30' standard Cooperative-owned pole.
Monthly Rate
|
Size |
Description |
|
Charge |
KWH |
|
12,000 |
Lumens |
Enclosed (150 Watt) (Metal Halide) |
$ 13.13 |
63 |
|
30,000 |
Lumens |
Enclosed (320 Watt) (Metal Halide) |
$ 18.77 |
121 |
|
30,000 |
Lumens |
Flood (320 Watt) (Metal Halide) |
$ 17.44 |
121 |
|
30,000 |
Lumens |
Shoebox (320 Watt) (Metal Halide) |
$ 21.49 |
121 |
|
40,000 |
Lumens |
Enclosed (400 Watt) (Metal Halide)13 |
$ 21.02 |
165 |
|
40,000 |
Lumens |
Flood (400 Watt) (Metal Halide)13 |
$ 19.97 |
165 |
|
40,000 |
Lumens |
Shoebox (400 Watt) (Metal Halide)13 |
$ 23.74 |
165 |
|
40,000 |
Lumens |
Mongoose (400 Watt) (Metal Halide) |
$ 23.18 |
165 |
|
78,000 |
Lumens |
Flood (750 Watt) (Metal Halide) |
$ 34.54 |
295 |
|
110,000 |
Lumens |
Flood (1000 Watt) (Metal Halide)13 |
$ 39.37 |
385 |
|
Size |
Description |
|
Charge |
KWH |
|
9,500 |
Lumens |
Semi-Enclosed (100 Watt) (Sodium Vapor) |
$ 9.50 |
43 |
|
9,500 |
Lumens |
Enclosed (100 Watt) (Sodium Vapor) |
$ 10.50 |
43 |
|
9,500 |
Lumens |
Flood (100 Watt) (Sodium Vapor) |
$ 10.22 |
43 |
|
9,500 |
Lumens |
Shoebox (100 Watt) (Sodium Vapor) |
$ 11.62 |
43 |
|
27,500 |
Lumens |
Enclosed (250 Watt) (Sodium Vapor) |
$ 14.12 |
105 |
|
27,500 |
Lumens |
Flood (250 Watt) (Sodium Vapor) |
$ 13.98 |
105 |
|
27,500 |
Lumens |
Shoebox (250 Watt) (Sodium Vapor) |
$ 15.95 |
105 |
|
50,000 |
Lumens |
Mongoose (400 Watt) (Sodium Vapor) |
$ 19.04 |
165 |
|
50,000 |
Lumens |
Flood (400 Watt) (Sodium Vapor) |
$ 17.43 |
165 |
|
50,000 |
Lumens |
Flood (400 Watt) (Sodium Vapor) |
$ 21.76 |
165 |
|
50,000 |
Lumens |
Mongoose (400 Watt) (Sodium Vapor) |
$ 20.92 |
165 |
|
Size |
Description |
|
Charge |
KWH |
|
7,500 |
Lumens |
Semi-Enclosed (175 Watt) (Mercury
Vapor) |
$ 11.50 |
74 |
|
7,500 |
Lumens |
Standard Post Top (175 Watt) (Mercury Vapor) |
$ 15.35 |
74 |
|
Dedicated Poles |
|
30' |
Wood |
$ 2.00 |
|
35' |
Wood |
$ 4.00 |
|
40' |
Wood |
$ 5.00 |
|
45' |
Wood |
$ 6.00 |
|
30' to 45' |
Fiberglass or Metal Pole |
$ 16.17 |
Explanatory Notes:
- No additional pole cost per month for lights mounted on existing distribution pole or secondary pole with existing secondary facilities (excluding temporary or construction service poles)
- Customer will pay the dedicated pole charge per month for each additional pole required to serve the light
- Monthly bill for underground service will be increased by $3.25 per pole in lieu of a one-time contribution of $150 per pole
- If a dedicated transformer is required for lighting there will be a $6.50 additional monthly charge
- Contract period for lighting fixtures mounted on existing distribution poles is 1 year
- Contract period for lighting fixtures mounted on a dedicated overhead pole is 3 years
- Contract period for lighting fixtures mounted on a dedicated underground pole is 5 years
- Contract period for decorative or nonstandard lighting fixtures mounted on a dedicated pole is 10 years
- The Contract period shall be renewed annually until terminated by the customer or Cooperative.
- All Contracts terminated before the expiration of the initial Contract period shall be subject to a 40% termination fee based on the remaining bills in the initial Contract term.
- Customer may be required to pay a termination deposit in accordance to existing service procedures
- All nonstandard and abnormal construction methods shall be subject to a Monthly Facilities Charge in accordance with the Line Extension Policy.
- Mercury vapor and some metal halide lighting fixtures are not available for new installations. Existing fixtures will be replaced with a compatible sodium vapor or metal halide fixture upon failure of the fixture or ballast at no charge to the consumer and will be billed in accordance to this schedule. Lamp replacement will continue to be made as long as replacement lamps are reasonably available from suppliers.
- All idle security lighting facilities will be removed from
service after 12-months of inactivity.
WHOLESALE POWER AND TIER ADJUSTMENT:
- Wholesale Power costs are included in the kilowatt- hour charges and are subject to adjustment annually. The above monthly rate will be adjusted by a factor necessary to maintain TIER (Times Interest Earned Ratio) as set forth by the Mortgage Agreements between the Cooperative and the lending agencies of RUS and CFC and as set by the Cooperative Board of Trustees.
Supersedes Schedule L-1A, Schedule L-4, Schedule L-5
Effective for bills rendered on and after November 1, 2010
* This is a printer friendly version of the original page, made to save you ink and paper.

Area Lighting Service
Availability
This Schedule is available for the leasing of mercury vapor; metal halide and sodium vapor outdoor lighting units to any member/owner served by the Cooperative and subject to established Service Rules and Regulations.
Type of Service
The member/owner must negotiate a one, two or three year agreement with a Santee Electric Cooperative representative before security lighting facilities are installed. The Cooperative will install, own and maintain equipment to supply lighting service mounted on a 30' standard Cooperative-owned pole.
Monthly Rate
|
Size |
Description |
|
Charge |
KWH |
|
12,000 |
Lumens |
Enclosed (150 Watt) (Metal Halide) |
$ 13.13 |
63 |
|
30,000 |
Lumens |
Enclosed (320 Watt) (Metal Halide) |
$ 18.77 |
121 |
|
30,000 |
Lumens |
Flood (320 Watt) (Metal Halide) |
$ 17.44 |
121 |
|
30,000 |
Lumens |
Shoebox (320 Watt) (Metal Halide) |
$ 21.49 |
121 |
|
40,000 |
Lumens |
Enclosed (400 Watt) (Metal Halide)13 |
$ 21.02 |
165 |
|
40,000 |
Lumens |
Flood (400 Watt) (Metal Halide)13 |
$ 19.97 |
165 |
|
40,000 |
Lumens |
Shoebox (400 Watt) (Metal Halide)13 |
$ 23.74 |
165 |
|
40,000 |
Lumens |
Mongoose (400 Watt) (Metal Halide) |
$ 23.18 |
165 |
|
78,000 |
Lumens |
Flood (750 Watt) (Metal Halide) |
$ 34.54 |
295 |
|
110,000 |
Lumens |
Flood (1000 Watt) (Metal Halide)13 |
$ 39.37 |
385 |
|
Size |
Description |
|
Charge |
KWH |
|
9,500 |
Lumens |
Semi-Enclosed (100 Watt) (Sodium Vapor) |
$ 9.50 |
43 |
|
9,500 |
Lumens |
Enclosed (100 Watt) (Sodium Vapor) |
$ 10.50 |
43 |
|
9,500 |
Lumens |
Flood (100 Watt) (Sodium Vapor) |
$ 10.22 |
43 |
|
9,500 |
Lumens |
Shoebox (100 Watt) (Sodium Vapor) |
$ 11.62 |
43 |
|
27,500 |
Lumens |
Enclosed (250 Watt) (Sodium Vapor) |
$ 14.12 |
105 |
|
27,500 |
Lumens |
Flood (250 Watt) (Sodium Vapor) |
$ 13.98 |
105 |
|
27,500 |
Lumens |
Shoebox (250 Watt) (Sodium Vapor) |
$ 15.95 |
105 |
|
50,000 |
Lumens |
Mongoose (400 Watt) (Sodium Vapor) |
$ 19.04 |
165 |
|
50,000 |
Lumens |
Flood (400 Watt) (Sodium Vapor) |
$ 17.43 |
165 |
|
50,000 |
Lumens |
Flood (400 Watt) (Sodium Vapor) |
$ 21.76 |
165 |
|
50,000 |
Lumens |
Mongoose (400 Watt) (Sodium Vapor) |
$ 20.92 |
165 |
|
Size |
Description |
|
Charge |
KWH |
|
7,500 |
Lumens |
Semi-Enclosed (175 Watt) (Mercury
Vapor) |
$ 11.50 |
74 |
|
7,500 |
Lumens |
Standard Post Top (175 Watt) (Mercury Vapor) |
$ 15.35 |
74 |
|
Dedicated Poles |
|
30' |
Wood |
$ 2.00 |
|
35' |
Wood |
$ 4.00 |
|
40' |
Wood |
$ 5.00 |
|
45' |
Wood |
$ 6.00 |
|
30' to 45' |
Fiberglass or Metal Pole |
$ 16.17 |
Explanatory Notes:
- No additional pole cost per month for lights mounted on existing distribution pole or secondary pole with existing secondary facilities (excluding temporary or construction service poles)
- Customer will pay the dedicated pole charge per month for each additional pole required to serve the light
- Monthly bill for underground service will be increased by $3.25 per pole in lieu of a one-time contribution of $150 per pole
- If a dedicated transformer is required for lighting there will be a $6.50 additional monthly charge
- Contract period for lighting fixtures mounted on existing distribution poles is 1 year
- Contract period for lighting fixtures mounted on a dedicated overhead pole is 3 years
- Contract period for lighting fixtures mounted on a dedicated underground pole is 5 years
- Contract period for decorative or nonstandard lighting fixtures mounted on a dedicated pole is 10 years
- The Contract period shall be renewed annually until terminated by the customer or Cooperative.
- All Contracts terminated before the expiration of the initial Contract period shall be subject to a 40% termination fee based on the remaining bills in the initial Contract term.
- Customer may be required to pay a termination deposit in accordance to existing service procedures
- All nonstandard and abnormal construction methods shall be subject to a Monthly Facilities Charge in accordance with the Line Extension Policy.
- Mercury vapor and some metal halide lighting fixtures are not available for new installations. Existing fixtures will be replaced with a compatible sodium vapor or metal halide fixture upon failure of the fixture or ballast at no charge to the consumer and will be billed in accordance to this schedule. Lamp replacement will continue to be made as long as replacement lamps are reasonably available from suppliers.
- All idle security lighting facilities will be removed from
service after 12-months of inactivity.
WHOLESALE POWER AND TIER ADJUSTMENT:
- Wholesale Power costs are included in the kilowatt- hour charges and are subject to adjustment annually. The above monthly rate will be adjusted by a factor necessary to maintain TIER (Times Interest Earned Ratio) as set forth by the Mortgage Agreements between the Cooperative and the lending agencies of RUS and CFC and as set by the Cooperative Board of Trustees.
Supersedes Schedule L-1A, Schedule L-4, Schedule L-5
Effective for bills rendered on and after November 1, 2010